Project description
Energy Efficient Building is the headquarter of Ministry of Ecology, Spatial Planning and Urbanism of Montenegro.
This project is funded by the EMIF (Environment Montenegrin – Italian Facility) and is strategically designed as an answer to local bioclimatic conditions (solar source, wind direction, air moisture…). Such approach contributed to energy-efficiency and reduced CO2 emission.
The building is equipped with roof solar systems, heat pumps, floor heating systems and BMS system for building management.
Commercial building with three levels above ground and one underground level.
Building has strong architectural design which is characterized by cube-geometry and contemporary facade.
Its main structure is combination of concrete, steel and engineered timber.
It is in the business zone of Podgorica, capital of Montenegro.
Building has capacity of 210 employees.
Main information
10 023 m²
Commercial building
Ministry of Ecology, Spatial Planning and Urbanism
Mario Cucinella Architects / Studio SYNTHESIS
Contractor
Company name: Strabag Ltd
Main Representative: Mr. Marko Radulovic
Number of collaborators: 500
Specialties: Building construction
Founded in: 2005
Biography: STRABAG is a European-based technology group for construction services and their services span all areas of the construction industry. They create added value for our clients by our specialized entities integrating the most diverse services and assuming responsibility for them. STRABAG bring together people, materials and machinery at the right place and at the right time in order to realize even complex construction projects – on schedule, of the highest quality and at the best price. Strabag generate an annual output volume of around € 16 billion at global level.
Contractor: Mr. Marko Radulovic
Key Challenges
-
Optimizing solutions and answering to the special requirements related to acoustics, and fire resistance.
-
Complex design with many custom systems and significant number of details.
-
Project was of national interest and every partner in this project wanted the highest level of quality.
Key Achievements
-
Great visibility because of the project importance.
-
Presence with Rigips, Isover and Weber products.
-
Close cooperation with Strabag team with a common goal of providing effective solutions.
-
Good reference for Saint-Gobain